b'PROJECTSCOMPLETEDThe Ice House Renovation Groover LabsN/A $5 millionOccidental Management completed renovations to aGroover Labs is a nonprofit, technology hub and makerhistoric building known as "The Ice House." The buildingspace. Renovations included a 14,000 square-foot lab now features 27,000 square feet of Class A office space aswith studio rental space, a woodshop, a metal shop and well as several balconies and a rooftop patio. Developersan electronics lab equipped with a laser cutter and a 3D retained the property\'s historic character while adding aprinter. This project contributes to the growing energy at new modern addition. the intersection of St. Francis and Second Streets.Spaghetti Works Phases 1 and 2 Naftzger Park$23 million (Phases 1 and 2) $3.9 millionThe Spaghetti Works project included the renovationThe newly redesigned Naftzger Park features the Evergy of a historic building into 44 residential units and thePavilion, an open lawn for events, flexible seating options, construction of a new Class A building along Douglasa dog run, a water feature, gardens and more. Plans were Avenue. The property features office tenants on the secondderived based on community input by the landscape floor and commercial tenants on the ground floor and wasarchitecture firm SWA Balsley. Evergy provided $1.4 million the catalyst for the redesign of the adjacent Naftzger Park. in additional funding to make this project possible.27 BUILD'