b'PROJECTS COMPLETED M A Y 2 0 2 0 - 2 0 2 1Fidelity Bank Phase 1 FireWorx$51 million (Phases 1 and 2) $1.1 millionFidelity Bank expanded their headquarters with the creationThe former Topeka Street Fire Station, originally built in of a ten-story tower and private car park. Phase1 included a1930, has been transformed into a co-working space for car park with 405 stalls and 24 electric car charging stationsartists and startup businesses. The first floor features open, with retail space on the ground floor. The rooftop willshared workspaces available for rent and the Sunflower become Rise Farms, one of the largest urban farms in theCafe, a local coffee shop. JACO General Contractor is the Midwest. Phase 2 will focus on the office tower. anchor tenant on the second floor.Hutton Headquarters Home2Suites by Hilton (Delano Catalyst Site)$5 million $12.5 millionHutton, a Wichita based construction company, designedA new extended-stay hotel is now open in the historic and built their new headquarters in the historic DelanoDelano District. The project is located at a key catalyst site District. The building features flexible meeting spaces,as identified in Project Downtown: The Master Plan for virtual reality capabilities, local artwork and more. ThisWichita. The hotel features 95 rooms, conference room project is located adjacent to an area recognized as aspace, an indoor pool, fire pits and a gathering space that catalyst site in the Project Downtown master plan. connects to a new public walkway.10'